Pipe Lay Inspection New Caledonia
A vLBV300 was recently used on a pipe lay inspection in New Caledonia , using a Gemini multibeam and tracking the vlbv assisted in touchdown monitoring and pipe placement and also assisted with support for anchor operations and placement. The vLBV300 handled the strong currents in the channel with ease and combined with the Tritech Gemini Multibeam allowed accurate monitoring of the pipe placement in the narrow corridor allowed .The vLBV was then used to place extra weights on the existing pipeline monitoring block placement and then disconnecting the crane




